Consigned PCB Assembly

By |Categories: PCB Assembly|Published On: April 28th, 2025|
consigned-pcb-assembly

Table of Contents

Y&T TECHNOLOGY · CUSTOMER-SUPPLIED MATERIALS

Consigned and partial-consigned PCB assembly, with a clear handover for your boards and components.

Supply all or selected materials for your build. Tell us which bare boards and BOM lines you will provide, and which items Y&T Technology should quote for sourcing or fabrication.

Standard assembly: within 20 days after deposit. Accepted expedited assembly: within 3 days after deposit, with the schedule confirmed in your quotation. PCB fabrication, component sourcing and freight are quoted separately.

Choose the material supply arrangement

Fully consigned materials

Provide the materials identified in the agreed supply list. Specify whether the kit includes bare PCBs, all fitted components and any other assembly items. Confirm what remains in the assembler’s scope.

Partial consignment

Supply selected BOM lines and ask us to quote the rest. Mark the owner and sourcing responsibility for each line, including shortages and parts requiring your approval.

For coordinated PCB fabrication, BOM sourcing and assembly, see full turnkey PCB assembly.

Send the kit list with your assembly RFQ

  • Released design: board revision, fabrication files or supplied-board specification, assembly drawings, placement data and DNP positions.
  • Editable BOM: exact manufacturer part numbers and suffixes, reference designators, quantity per board and requested finished quantity.
  • Consignment list: supplied quantity by BOM line, packaging format, lot or date-code requirements, and materials still missing.
  • Build requirements: inspection and test scope, firmware or programming instructions, fixtures and required records.
  • Delivery brief: planned kit arrival, delivery country and postcode, requested dates and open questions.

Download the PCBA RFQ & BOM worksheet

Optional Excel workbook (XLSX, 8 KB). Your existing BOM format is welcome. Mark customer-supplied items and DNP positions, and use a separate file set for each board revision.

Start with available files and describe what is missing. For an NDA before sharing design files, contact our team first.

Agree the handover before shipping parts

  1. Match the kit to the build: identify the board revision, BOM lines, quantities, package labels and customer-owned tooling.
  2. Describe packaging and condition: state reels, cut tape, tubes, trays or loose parts; include storage, ESD or moisture-sensitive handling information where relevant. Accepted packaging is reviewed for the project.
  3. Allow for setup and handling: request extra material allowances by part or package. The accepted allowance depends on the kit and build; do not assume one fixed percentage suits every component.
  4. Confirm shipping instructions: agree the receiving address, contact, shipment reference and import arrangements before sending materials. State who is responsible for freight, duties and other shipment costs.

Do not ship the kit until receiving details and the proposed supply arrangement have been confirmed.

Resolve shortages and remaining material clearly

Kit reconciliation

Agree how received quantities and exceptions will be checked against your list. Identify the decision maker for missing, damaged, mismatched or unsuitable items before affected assembly work proceeds.

Shortage and substitute approval

Decide whether you will replenish a shortage or request sourcing. Identify permitted alternatives and approval requirements before procurement or use.

Unused parts and customer property

Agree how remaining components, unused boards, packaging and tooling should be identified and returned or held. Ownership, storage, suitability for reuse and associated costs need written agreement.

Build and inspection scope

Specify inspection, programming and functional tests, acceptance criteria and records. The quotation confirms included work and any preparation or fixture requirements.

Plan the schedule around a complete, approved kit

Identify kit arrival, pending parts and unresolved design questions in the RFQ. These affect which assembly schedule can be accepted. Confirm material readiness and the approved file set before committing to the quoted release.

For an initial design evaluation, see prototype PCB assembly. For variants or repeated small batches, see low-volume, high-mix assembly.

Consigned assembly purchasing questions

Can I supply components but ask you to manufacture the bare boards?

Identify this arrangement in the RFQ and attach fabrication data alongside the BOM and assembly files. The quotation separates PCB fabrication, any component sourcing and assembly.

Can I supply only selected or hard-to-source parts?

Mark those items and quantities in the consignment list, and identify remaining lines to be sourced. Keep approval requirements for alternatives explicit.

How many spare components should I send?

Provide package formats, fitted quantities and available material. Request a project-specific setup and handling allowance before shipping, especially for scarce or expensive parts.

Can remaining material be used for a later order?

Identify the intended repeat build. Holding, condition checks, ownership and suitability for the next released BOM must be agreed; storage and reuse are not automatic.

Start with the material list you have

Send the board revision, build quantity, supplied BOM lines, packaging and delivery destination. List open questions so engineering and purchasing can review the same scope.

[email protected] · WhatsApp +86 13570802455

Explore the overall PCB assembly service scope.

Project feedback and quality documentation

Our team’s general assembly feedback illustrates project communication. For a consigned build, separately agree incoming material acceptance, component ownership and the documents you need.

Read anonymized assembly project feedback · Review quality-document requirements

Share This Post, Choose Your Platform!

Contact us

Free Quote

File formats & upload help

For PCBA, send Gerber files in a ZIP, an XLSX/CSV BOM, placement data and PDF assembly or test instructions. Keep all files on the same board revision.

Each file must be smaller than 100 MB. If a file is rejected or the upload fails, submit your enquiry without it and tell us what is missing. For a larger package, contact [email protected] to agree a transfer method. Include your RFQ reference if you already have one.

Download the RFQ / BOM template

Click or drag a file to this area to upload.